Durch Wasserkraft erzeugter Strom, netto

16,81 (billion kilowatthours) in 2022

The amount of gross generation less the electrical energy consumed at the generating station(s) for station service or auxiliaries. Electricity required for pumping at pumped-storage plants is regarded as electricity for station service and is deducted from gross generation. Both conventional and combined hydroelectric plants. Conventional hydroelectric plant is a plant in which all of the power is produced from natural streamflow as regulated by available storage. Combined hydroelectric plant is a hydroelectric plant that uses both pumped water and natural streamflow for the production of power.

Datum Wert Ändern , %
2022 16,81 2,98 %
2021 16,32 10,57 %
2020 14,76 -5,37 %
2019 15,60 -1,28 %
2018 15,80 -1,45 %
2017 16,04 6,76 %
2016 15,02 12,74 %
2015 13,32 -27,34 %
2014 18,34 1,23 %
2013 18,12 29,59 %
2012 13,98 -16,26 %
2011 16,69